Rehabilitation of Raw Water Intakes- Cum Pumping Station at Akute Lot 1
Lagos Water Corporation Nigeria
Rehabilitation of Raw Water Intakes- Cum Pumping Station at Akute Lot 1

The overall objective is the rehabilitation of the raw water intake pumping stations at Akute, Lagos. In these stations, there are typically large size vertical pumps with capacity of 305 KW to 1400 MW and delivering between 1,100 m3/hr to 4,500m3/hr. The task in the rehabilitation work is 2NUWSRP to achieve the design capacity of the Pumping Station which is to deliver 52,000m3/day for Ogun2 & 3 Pumping Stations and 72,000 m3/day for Adiyan Pumping Station. In accomplishing these objectives, the milestone of restoring the operation of all the raw water pumps in the respective pumping stations would be a key indicator of the success of the project.