Rehabilitation of Iju Waterworks Contract 12-2C
Lagos Water Corporation Nigeria
Rehabilitation of Iju Waterworks Contract 12-2C

Work comprised the design and refurbishment of the entire existing system, Horizontal and vertical flow sedimentation tanks, filtration equipment (34 No beds) – Paterson Candy Filters, chemical dozing system comprising Alum and Lime dosing, chlorination with associated chemical dosing ducts and pipping, replacement of clear water pumps, each of 1,420 m3/hr, Installation of 1,200mm pipe and accessories, two new set of generators, each of 1,500 KVA,, electrical panels of 3.3 KV, 11 KV and 415 KV with accessories and PLC’s for the rehabilitation of Iju Waterworks System.